Interview questions in power distribution company..
1. What do you mean by RAPDRP.
ANS- The Restructured
Accelerated Power Development and Reforms Programme started in 2008.the
main motive of this project is to minimizes the Aggregate Technical and
Commercial (AT&C) losses in the power sector. Generally RAPDRP is revised
version of Accelerated Power Development Reforms Programme (APDRP).
2. What is the length of H beam
used in distribution systems.
Ans-
In India distribution system generally its three types are used.
1. 9 meter- it is used for transmission HT and LT line both.
2 .11 meter- it is used for transmission 11kv
3 13 meter - it is used for transmission of 33kv
Ans-
In India distribution system generally its three types are used.
1. 9 meter- it is used for transmission HT and LT line both.
2 .11 meter- it is used for transmission 11kv
3 13 meter - it is used for transmission of 33kv
3. What is the length of RSJ beam used in distribution systems.
ANS- 9.3 meter- it is used for transmission LT line.4. What is essential part or materials for making a stay on beam.
Ans- six things are used for making a stay
stay rod 20 of meter
Stay Elbow
Anchor plate
Thimbles
Eye bolts
Stay insulator